Bonanza Power Plant
CCR Rule Compliance
The following documents are provided in accordance with the U.S. EPA Coal Combustion Residuals (CCR) Rule. They cover structural stability, operating criteria, groundwater monitoring, corrective action, and closure planning for the Bonanza Power Plant ash management facilities.
Contact Us: For questions relating to the availability of information on this page, please email
environmental@deseretpower.com
with your name, organization, contact information, and question.
Location Restrictions
| Document Name | Description | Download |
|---|---|---|
| Stability Demonstration | Stability Demonstration | Download |
Operating Criteria
| Document Name | Description | Download |
|---|---|---|
| 2021 Fugitive Dust Control Report | 2021 Fugitive Dust Control Report | Download |
| 2022 Fugitive Dust Control Report | 2022 Fugitive Dust Control Report | Download |
| 2023 Fugitive Dust Control Report | 2023 Fugitive Dust Control Report | Download |
| 2024 Fugitive Dust Control Report | 2024 Fugitive Dust Control Report | Download |
| 2025 Fugitive Dust Control Report | 2025 Fugitive Dust Control Report | Download |
| Bonanza Power Plant, Annual PE Inspection 2021 | Bonanza Power Plant, Annual PE Inspection 2021 | Download |
| Bonanza Power Plant, Annual PE Inspection 2022 | Bonanza Power Plant, Annual PE Inspection 2022 | Download |
| Bonanza Power Plant, Annual PE Inspection 2023 | Bonanza Power Plant, Annual PE Inspection 2023 | Download |
| Bonanza Power Plant, Annual PE Inspection 2024 | Bonanza Power Plant, Annual PE Inspection 2024 | Download |
| Bonanza Power Plant, Annual PE Inspection 2025 | Bonanza Power Plant, Annual PE Inspection 2025 | Download |
| Bonanza Power Plant, CCR Landfill Run On Run Off Control Plan (Fly Ash & Bottom Ash Landfills) | Bonanza Power Plant, CCR Landfill Run On Run Off Control Plan (Fly Ash & Bottom Ash Landfills) | Download |
| CCR Fugitive Dust Control Plan | CCR Fugitive Dust Control Plan | Download |
| Initial Bonanza Power Plant CCR Units Run On Run Off Plan | Initial Bonanza Power Plant CCR Units Run On Run Off Plan | Download |
Ground Monitoring & Corrective Action
| Document Name | Description | Download |
|---|---|---|
| 2021 Annual Groundwater Report | 2021 Annual Groundwater Report | Download |
| 2022 Annual Groundwater Report | 2022 Annual Groundwater Report | Download |
| 2023 Annual Groundwater Report | 2023 Annual Groundwater Report | Download |
| 2024 Annual Groundwater Report | 2024 Annual Groundwater Report | Download |
| 2025 Annual Groundwater Monitoring and Corrective Action Report | 2025 Annual Groundwater Monitoring and Corrective Action Report | Download |
| Groundwater Monitoring System Certification | Groundwater Monitoring System Certification | Download |
| Groundwater Monitoring Design Document | Groundwater Monitoring Design Document | Download |
| Groundwater Monitoring Design Document | Groundwater Monitoring Design Document | Download |
| Groundwater Monitoring Design Document | Groundwater Monitoring Design Document | Download |
| Groundwater Statistical Method Certification | Groundwater Statistical Method Certification | Download |
| Monitoring Well Network – Construction Documents | Monitoring Well Network - Construction Documents | Download |